As the coordinator of the roof renovation project, my role began with a detailed inspection of the existing roof. During the inspection, several issues were identified, including rusted roofing sheets, loose fixings, and areas where water had been penetrating into the building. These defects explained the damp patches and ceiling stains observed inside the structure. The inspection also covered the timber supports and drainage system to determine their condition and level of damage.
After documenting the defects, I coordinated the renovation plan with the work team. Priority was given to areas with severe damage to prevent further deterioration. Damaged roofing sheets were removed and replaced, while weak timber members were reinforced to improve structural stability. Proper fixing methods were applied to ensure the new materials were securely installed. The drainage paths were also cleared and adjusted to allow smooth water flow during rainfall.
Throughout the renovation process, I monitored the work to ensure quality and compliance with the planned procedures. After completion, the roof was more secure, watertight, and visually improved.
Conclusion
Coordinating the roof renovation ensured that defects were properly addressed and work was carried out efficiently. The project improved the roof’s durability, safety, and overall performance, providing long term protection for the building.