A good renovation is as much about timing as it is about skill. Even a great contractor can be late if the plumber comes too early, or the painter arrives before the drywall is done. Expert renovators understand that good scheduling keeps a project going smoothly, with everyone working when they should.
- Have a Plan Ready
Before any work begins, pros make a detailed project schedule. It covers everything from taking things apart to the final details, with due dates for each task.
- Know Who Goes First
Renovations usually go in this order:
Demolition: Clear out the space.
Framing: Build or fix walls.
Plumbing and electric: Put in pipes and wiring.
Drywall: Close up the walls.
Painting: Add color.
Flooring: Finish the floors.
Cabinets and fixtures: Put in the final touches.
- Plan for Inspections
Some jobs need city inspections before you can move on. Pros schedule these early to avoid delays.
- Add Extra Time
Bad weather, supply problems, or surprise fixes can mess up a schedule. Pros add days between jobs so a small issue doesn’t cause a big delay.
- Communicate
Contractors keep in touch with everyone, calling, texting, and emailing daily to check arrival times and progress.
- Don’t Overlap
If many workers are in the same place at once, work slows down and accidents can occur. Pros spread out the schedule so each team has space to work.
In Short
Renovation scheduling is like running a show; each worker has a part, and the timing has to be right. When the plan is ready, inspections are set up, and everyone knows when to work, the project goes well, and the home is completed on time.